How To
 

 
Howard Helix
Howard Helix connecting lower level.
Hinkle Signals
Signals at Hinkle Interlocking


NEW!
The signal dept has begun to wire up the SE8C and BDL boards in anticipation of adding true CTC signaling...Details

This Helix was built from the Mike Pagano article earlier in 2003 in N Scale Railroading. I am currently installing track.

New Pasco Yard Plan.

 

 

 

 

Also being installed are signals at each mainline interlocking. I am using Sunrise Signals and a Radio Shack ICC connector to allow the signals to be knocked over during operation or maintenance and not be hurt. They can also be changed out.

More later!

 

 

 

 

Novices are welcome. We are working on a method to dIspatch via Internet with Ray as the dispatcher based on east coast.
I live in CA/Central CA, near Nevada City.

Email me for information on operating sessions
Kent Williams or call me at 530-478-7615 (W) Days.



© 2004  Kent Williams, a member of NMRA, and UNW All Rights reserved