 |
Pasco yardmaster |
Check
Blog
for Latest
Also see my Tumblelog for day to day musings
NEW!! Download slide show from March 18 op session
email me at 
NEWSFLASH:
Operating
Session Schedule for 2008
"FUN RUNS"
Fun runs will be held 1-2 times per month (2-3 hours). Email or call me if interested. These might be a Friday night or a Weekend day as folks are interested. Call me or email me via my blog comments
"ALL DAY SESSION"
I will only host at the most, 2 large Saturday all day op sessions in 2008. Email me if interested in crew calls:
April 26 is firm
October 25
see image above for email address
I have room for 9-10 operators
|
2006
Slide show from March 18 op session
2008
Photos from Jan 05 operating session.
2004
Other Photos
January
30 -
Began adding signaling system.
2003
December
26 -
Added lower
industrial shelf below Walla Walla for 3 industries.
December
10 - Connected Helix to Arrival Depature Tracks
in Salmon Bay Yard
November
15 - Added Helix down from Pasco to Lower Layout
shorteline.
Also started adding signals on mainline turnouts, initially controlled
by Tortoises.
June
19- Portland Yard turnout control and industrial
spurs operational. West end Classification yard ladder
control operational.
May
14- Walla Walla Branch line added and future
site of Lumber company area begun
April
12- Been a while since photos, I have
done a few things--added Car Cards and WayBills,
Power zones, staging yard turnout control; Installed Walla
Walla branch line. Firmed up mainline turnout control; about
50 engines with decoders. 200 cars with low profile wheels.
Began Backdrop Painting. But I have been remiss in putting
up progress photos.
2002
January
4--Moved in and begun to add wall brackets for shortline
February
7--Lighting Valence built in ceiling
March
1--Benchwork being added for new upper level
March
12--Subroadbed added for new mainline
March
31--Staging added in Garage
April
15--Interchange yard added
April
28--Mainline is completed. Golden Spike set.
June
5--Fascia and turnout control added
June
24--GarageYard operational
August
15 Schematic added
November
1- Photo of Portland Terminal Yard (resulting
from lot of work)
November
2 - Eugene Staging Added (again resulting from
a lot of work)
© 2008 Kent Williams, a member
of NMRA, and UNW All Rights reserved
|